1
/
of
6
MyLoc8
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 12-Mo Subscription Incl
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 12-Mo Subscription Incl
Regular price
$179.92 USD
Regular price
$179.92 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Overview
- Brand : MYLOC8
- Special Feature : Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
- Connectivity Technology : 4G, Bluetooth, Wi-Fi
- Supported Application : GPS (iOS, Android), Web Platform
- Specific Uses For Product : Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking
About this item
- Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7.
- Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
- Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection
- No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
- Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most
Share
